Civil Engineer Resume Template 2022

I am a Civil Engineer in DAE CIVIL (3 Years) from Punjab Board Technical Education Lahore, Pakistan.

I am looking for a successful and productive company in the field of Civil Engineering and technology-related.
I hope once I get the opportunity in your organization, where I can explore the technical capabilities that I have acquired through my education while befitting for your organization.

While I am working in Saudi Arabia since 2016 in different sectors of Civil Engineering and I have also worked experience in Pakistan.

My enclosed resume provides additional details about my background. I hope you will consider my application sympathetically and if possible arrange my interview at your convenience. Thank you for your consideration.

I am an enthusiastic and professional Civil Engineer, who enjoys being part of a successful and productive team. I am quick to grasp new concepts and develop innovative and creative solutions to problems. I am able to work well on my own initiative and can demonstrate the high levels of motivation required to meet the tightest of deadlines. Even under significant pressure, I possess a strong ability to perform effectively.

To build a strong career in Civil Engineering by applying the specialized skills that I possess and to work in a challenging environment with my skills and knowledge and for the betterment of the organization.

DAE (Civil Engineer)
Punjab Board of Technical Education Lahore – Pakistan.

• Proficiency in Using Auto CAD 2000, 2004, 2006
• Good Knowledge of Splicing And Testing
• Operating Windows Software applications ( MS – Office Automation ) Internet & emailing division

PRESENT EMPLOYMENT

  1. Company Name: SINOHYDRO CORPORATION Ltd.
  2. Client: Saudi Aramco Oil Company Saudi Arabia
  3. Project Location: National Guard Family Housing Scheme Project, Thuwal, Makkah, Saudi Arabia.
  4. Current Job Titled: Site Engineer

Responsibilities:
A). Monitoring of sub-contractor work activities and checking of materials required revised isometric.
B). Ensure all RFI are implemented.
C). Monitoring of work to ensure installation as per the specifications
D). Coordinates to Subcontractor Area Manager to instruct the following isometric modification and latest revision.
E). Detail scheduling of work daily and weekly.
F). Execution of works at the site through area supervisor and foreman.
G). Precast Manholes casting for different departments and monitoring as per design and installation.

  • Present Employment Status: Full-Time March 2017 To Dec 2019
  • Company Name: SINOHYDRO Co. Ltd. Yanbu Branch SINOHYDRO CORPORATION Ltd.
  • Clint: ROYAL COMMISSION YANBU-AL BEHAR KSA.
  • Project: Yanbu University and Medical College For Boys (YUMC) Yanbu-Al Behar Madina Saudi Arabia.
  • Current Job Titled: Site Engineer

Responsibilities:
A). Monitoring of sub-contractor work activities and checking of materials required revised isometric.
B). Ensure all RFI are implemented.
C). Monitoring of work to ensure installation as per the specifications
D). Coordinates to Subcontractor Area Manager to instruct the following isometric modification and latest revision.
E). Detail scheduling of work daily and weekly.
F). Execution of works at the site through area supervisor and foreman.
G).To attend daily co-ordinate meetings.
H). Contract quality standards specifications and requirements.
I). Reviewing of all 3rd party test reports for acceptance.
J). Submit daily reports & weekly work plans.

  1. Company Name: Ismail Haikal General Contracting Company
  2. Project: Water Desalination & Power Plant Project Yanbu-III KSA.
  3. Client: Saline Water Conversion Corporation (SWCC).
  4. Current Job Titled: Site Engineer

Responsibilities:
A)-Inspections of work as per standards
B)-Coordination with the client regarding issuance of drawings, and erection priorities.
C)-Prepare and Submit reports to senior management.
D)-Execution of the work as per the specified drawings.
E)-Check certificates of incoming materials & dimensional inspections as per drawings
F)-Review of material submittal & Performance.
G-. Monitoring of sub-contractor work activities and checking of materials required revised isometric.
H)- Ensure all RFI are implemented.
I)-Monitoring of work to ensure installation as per the specifications
J)-Coordinates with Subcontractor Area Manager to instruct the following isometric modification, and latest revision.
K)- Detail scheduling of work daily and weekly.
L)- Execution of works at the site through area supervisor and foreman.

Company Name: Saadullah Khan & Brothers Engineering Construction

1. Project: Widening and Improvement of National Highway N – 25, section – 1, ICB I & III, Quetta.

• Client: National Highways Authority, Islamabad Pakistan.

• Job titled: Quality Controller/Site Engineer

Responsibilities:
Estimating quantities, Preparing Interim payment certificates IPC, Progress Reports monthly and weekly, Plotting X-Section of Roads, Shop drawings of culverts

Responsibilities:

Structure Sites Estimating quantities, Plotting Shop drawings of culverts & bridges, lay-outing Bar Bending Schedules and executing the work, scheduling and planning the available site machinery according to work condition, Preparation of sub contractor’s bills, Progress reports weekly and monthly. And monitoring the site activities. Precast Pipe Culverts Installation Box Culverts Installation.

Quality Control section

According to the responsibility of QC, he is engaged in each and every single step of any structure construction. Verifying the material like sand, cement, bricks, etc as per standard of the client or as per specification, taking samples for laboratory tests on the basis of test results approving the materials,

Job Location: Anywhere National or International.
Job Category: Civil Engineer
Employment Status: Full Time

Currently include History Books, and Knowledge-Based Magazine.
Music, English Movies. Cricket, Football, Tennis.

admin
Author: admin